photo de profil d'un membre

Marco AMBROSANIO

AMBROSANIO MARCO GTGC 2010

Résumé

de retour en France

Expériences professionnelles

Project manager

PERMASTEELISA FRANCE , Paris la defense - CDI

De Janvier 2020 à Aujourd'hui

Assistant project manager

PERMASTEELISA GROUP , North point - CDI

De Septembre 2016 à Janvier 2020

Project Manager from PMU stage to the completion of the facade works of the Museum + Tower and Podium in Hong Kong.

Design (architectural) and civil engineer

LEIGHTON ASIA , Wan chai - CDI

De Mai 2013 à Septembre 2016

Redevelopment of the existing railway and subway station by adding two level of platforms 250m long, built underneath the existing railway station and a stadium.

Procurement and design development (ABWF):
• Prepare tender packages and develop design submission for the packages related to the station platforms: structural steelwork, glass wall (3,000 sq. m), aluminum cladding (2,000 sq. m), architectural metal ceiling (9,000 sq. m), wet trades, etc…
• Coordinate the design on BIM model with other trades and designated contractors.

Methods and site works (civil works):
• Development methods, master program and design for the bulk excavation and lateral support, formwork and concrete works.
• Coordinate the construction of the diaphragm wall (Intrafor), the underpinning (Freyssinet), 3-meter-thick slab and demolition of a building.

Quality (civil and ABWF)
• In charge of the as-built and handover submissions to the Hong Kong government for the opening of the Ocean Park and Wong Chuk Hang external subway stations on the project of South Island Line – 903.

Facade designer

DRAGAGES HONG KONG Ltd , Hong kong - Autres

De Décembre 2010 à Décembre 2012

Define budget and objective; prepare subcontracts and tenders; develop with the building enclosure team, architects and consultants the façade design of the Cruise Terminal Building (glass wall, cladding works, canopies, steelworks).

Building enclosure deputy site engineer

BOUYGUES BÂTIMENT CENTRE SUD-OUEST , Labege cedex - Stage

De Avril 2010 à Septembre 2010

Follow progress, quality and safety of the cladding subcontractor (SMAC - Colas group) and building enclosure (Acieroid, Bouygues France/Europe; Réalco, Baumert, Artel.
Clinique Pierre Paul Riquet : Large scale project: 300M€ in south of France (Toulouse), with different types of facade systems: terra cotta, Eternit (cement board) panels, utilized glass wall, stick glass wall.

Parcours officiels

POLYTECH LILLE – Ingénieur – GC (GTGC) – 2010